Obee
Captain
- Joined
- Aug 27, 2009
- Messages
- 5,945
Here is another repair I did for another collector, this time the NA 179 Foot Dragoon Standing Ready suffered 2 broken legs.
I drilled both the stumps and the base legs using a 1.0mm drill and added wire pins which were Supa Glued into the base.
Next the part was glued into position, filed flat and filled with filler and smoothed over.
Then filed again to smooth over the filler, and now it was ready to match paint and finish.
Easy
John
I drilled both the stumps and the base legs using a 1.0mm drill and added wire pins which were Supa Glued into the base.
Next the part was glued into position, filed flat and filled with filler and smoothed over.
Then filed again to smooth over the filler, and now it was ready to match paint and finish.
Easy
John